Workload Time allocation Projects Management

Measure the time spent, and the real workload of your teams

Knowing how much time an activity takes changes the trade-offs: what you strengthen, what you stop, what you invoice.

I want a demo
Management

The real workload, not the assumed one

A workload split estimated in a meeting almost always differs from the reported reality. The gap is what is interesting.

Distribute the workload

Time reported by team and by activity shows where the workload really concentrates, so you can make trade-offs based on facts.

  • Breakdown by team and by activity
  • Comparison between periods
  • Analysis dimensions based on your organisation

Allocate by project

Allocating time by project or by cost centre gives the real cost of an activity, at the level of detail you will actually use.

  • Project or cost centre allocation
  • Level of detail chosen to suit your needs
  • Gap between planned and actual

Decide based on facts

Indicators are built with the reporting tool, on your dimensions, and cross-analysed with absences and training.

The prerequisite

Everything depends on the quality of data entry

A timesheet filled in from memory on a Friday evening produces figures that are precise and wrong. The detail of data entry decides the value of management.

The unit that suits you

You define the unit of time measurement for each activity. Allocate by the day for attendance tracking, by the minute for an activity billed on actuals: your configuration decides.

  • By the minute, the hour or the quarter day
  • By the half day or the full day
  • Unit defined activity by activity

Copy rather than re-enter

Drag and drop copies time allocations from one day to the next. Over a regular week, the timesheet fills itself without going back day by day.

  • Time allocations copied by drag and drop
  • Quick, autonomous entry by the employee
  • Only the exception is corrected

The timesheet, generated and logged

The monthly activity sheet is generated as a PDF when supporting evidence is needed, and the confirmation process stays paperless from start to finish.

  • PDF generation of the monthly sheet
  • Paperless confirmation process
  • Traceability of approvals

How data entry becomes reliable

Configurable pre-ticking brings entry down to a few seconds: the employee corrects the exception instead of re-entering the rule. Entry is blocked on absence days, time records left behind by a cancelled absence are purged, and duplicates are detected before approval.

Details of the module and its screens are available on the page time and activities.

What everyone gains

The employee, the manager, the HR team

The manager

The breakdown by team and by activity, compared between periods

The HR team

Analysis dimensions based on your organisation, cross-analysed with the other modules

Frequently asked questions

More about time tracking

At what level of detail should time be allocated?
At the level you will actually use. Going finer than necessary makes entry heavier without improving decisions, and causes completion rates to drop.
How do you get timesheets filled in?
By making entry short. Configurable pre-ticking is the main lever: in a stable organisation, weekly entry drops to a few seconds.
Does time data feed into payroll?
Variable items from time data join those sent to your payroll software. Nicoka HRIS prepares and transmits; it does not calculate payroll.
Can managers’ fixed-days contracts be tracked?
Yes. Time is counted in days for employees on a fixed-days contract, and the project manager tracks their team’s activity on the same basis as everyone else.
Can time data be used for invoicing?
Yes, reported time can feed customer invoicing, which avoids rebuilding the hours worked from a spreadsheet at the end of the month.

See the real workload of your teams

Bring your activities and your projects. We will show you what a reported week looks like, and what you can learn from it.

I want a demo